A STUDY ON BUILDING CONSTRUCTION INVESTMENT FEASIBILITY

Authors

  • Meriana Wahyu Nugroho Hasyim Asy’ari University
  • Lyya Supriono Merdeka University

DOI:

https://doi.org/10.33474/jice.v1i1.9060

Keywords:

Invesment, Nett Present Value, Benefit Cost Ratio, Internal Rate of Return, Payback Period

Abstract

The level of society’s awareness on education is very high. The society’s enthusiasm to take a higher education is enormous. Every year the society’s interest in joining Hasyim Asy'ari University of Tebuireng Jombang is increasing. For this reason, Hasyim Asy'ari University of Tebuireng Jombang plans to add the classes by constructing new buildings that can accommodate more students each year. Every construction certainly has a risk. To anticipate this, a feasibility study is carried out at the early stages of construction planning so that later the construction runs well. There are three methods used to analyze investment feasibility, namely, Net Present Value (NPV) method, Benefit Cost Ratio (BCR) method and Internal Rate of Return (IRR) method. Besides using those methods, the payback period for the building construction project of Hasyim Asy'ari University of Tebuireng Jombang is also calculated. Based on the results of the analysis conducted, it was found that the construction of Hasyim Asy'ari University of Tebuireng Jombang was feasible to be carried out referring to the NPV and B/C values which were higher than one and the IRR value was higher than MARR and the payback period was for 7 years and 5 months. Thus, the investment project is declared feasible to proceed.

References

A. Prastiwi and C. Utomo, “Analisa Investasi Perumahan Green Semanggi Mangrove Surabaya,†Tek. Pomits, vol. 2, no. 2, pp. D191–D196, 2013.

Dugdale R.H., 1980, Surveying, 3rd Edition, George Godwin Limited, London.

Karnila, 2012. Analisis Nilai Hasil Terhadap Biaya pada Proyek Kontruksi (Studi kasus

Pada Proyek Pembangunan

Kodoatie, Robert j., 1994, “Analisa Ekonomi Teknikâ€, Andi Yogyakarta, Yogyakarta.

M. F. Lisan, “Studi Kelayakan Finansial Pembangunan Gedung Parkir Ponpes Amanatul Ummah Desa Kembang Belor Kecamatan Pacet Mojokerto,†J. Tek. Sipil UNTAG Surabaya, vol. 8, no. 2, pp. 191–206, 2015.

F. Utu, “Studi kelayakan investasi pengembang perumahan,†vol. 3, no. 2, pp. 44–54, 2017.

E. S. Widiya Putri, Naomi Nessyana Debataraja, “Analisis Kelayakan Pada Investasi Hotel Xy Di Kalimantan Barat,†Bul. Ilm. Mat, Stat, dan Ter., vol. 08, no. 2, pp. 255–262, 2019.

H. Y. Ari, Zainuri, and Winayati, “Analisis Investasi Pada Pembangunan Perumahan Nuansa Beringin,†J. Tek., vol. 13, no. 2, pp. 120–127, 2019.

I. Elisa, I. G. B. Wiksuana, L. Gede, and S. Artini, “Study Kelayaan Pembangunan Investasi Dili Undil di Timor Leste,†vol. 9, pp. 506–519, 2014.

M. F. Subkhan, “Analisis kelayakan finansial pembangunan rusunawa,†J. Tek. sipil Prokons, vol. 8, no. 1, pp. 93–102, 2014.

S. R. Jemmy Kristianto, Rosmitha Indah, Herry P. Chandra, “Analisa Kelayakan Investasi Hotel Di Maluku Tenggara Yang Menerapkan Konsep Energy Efficiency Dan Indoor Air Health,†J. Dimens. Pratama Tek. Sipil, vol. 5, no. 1, pp. 1–9, 2016.

H. A. A and B. Laksito, “Analisis investasi bangunan gedung (Studi Kasus Pada Proyek Pembangunan Gedung Rawat Inap RSUP Dr. Kariadi Semarang),†e-Jurnal MATRIKS Tek. SIPIL, no. eISSN 2354-8630, pp. 297–304, 2014.

Y. Arianti, “Analisis kelayakan ekonomi rumah susun sederhana pekanbaru,†J. Sains dan Teknol., vol. 3, no. 1, pp. 16–22, 2013.

Downloads

Published

2020-11-02

How to Cite

Nugroho, M. W., & Supriono, L. (2020). A STUDY ON BUILDING CONSTRUCTION INVESTMENT FEASIBILITY. Journal Innovation of Civil Engineering (JICE), 1(1), 28–31. https://doi.org/10.33474/jice.v1i1.9060

Issue

Section

Articles