[1]
Firmansyah, M.R., Kholis, N., Nugroho, M.W. and Sundari, T. 2026. Critical path Time Cost Trade-Off Analysis on The Sumobito Health Center Rehabilitation Project. Journal Innovation of Civil Engineering (JICE). 6, 2 (Jan. 2026), 208–218. DOI:https://doi.org/10.33474/jice.v6i2.21031.