[1]
Faathir, A. and Handayani, R. 2021. BENEFIT COST RATIO (BCR) ANALYSIS ON THE RECONSTRUCTION WITH HARDENED ROAD SHOULDER PROGRAM IN EAST JAVA PROVINCE. Journal Innovation of Civil Engineering (JICE). 2, 1 (Jun. 2021), 16–30. DOI:https://doi.org/10.33474/jice.v2i1.11064.