Firmansyah, M. R., Kholis, N., Nugroho, M. W., & Sundari, T. (2026). Critical path Time Cost Trade-Off Analysis on The Sumobito Health Center Rehabilitation Project. Journal Innovation of Civil Engineering (JICE), 6(2), 208–218. https://doi.org/10.33474/jice.v6i2.21031