Faathir, A., & Handayani, R. (2021). BENEFIT COST RATIO (BCR) ANALYSIS ON THE RECONSTRUCTION WITH HARDENED ROAD SHOULDER PROGRAM IN EAST JAVA PROVINCE. Journal Innovation of Civil Engineering (JICE), 2(1), 16–30. https://doi.org/10.33474/jice.v2i1.11064