Firmansyah, M. R., Kholis, N., Nugroho, M. W. and Sundari, T. (2026) “Critical path Time Cost Trade-Off Analysis on The Sumobito Health Center Rehabilitation Project”, Journal Innovation of Civil Engineering (JICE), 6(2), pp. 208–218. doi: 10.33474/jice.v6i2.21031.