CONDITION ASSESMENT OF GLENDENG BRIDGE USING BRIDGE MANAJEMENT SYSTEM (BMS) IN TUBAN DISTRICT

Authors

  • Ahmad Faathir Wicaksono Junior Road and Bridge Engineer, East Java Province Road Agency
  • Ratna Handayani Junior Road and Bridge Engineer, East Java Province Road Agency

DOI:

https://doi.org/10.33474/jice.v1i2.10997

Keywords:

Bridge Manajement System, Glendeng, Condition Number, Truss Bridge, Approach Road

Abstract

The valuation of Glendeng Bridge condition in Tuban District is needed to evaluate the deterioration of the bridge caused by the Bengawan Solo river flooding since the high rainfall which was made worst by the excavation of the bridge protection structure. This research is conducted through the direct visual survey by recorded the detail element of the bridge deterioration based on the deterioration code and assessed the level of severity and structural condition whether the element affecting the other element and suffering the overall bridge condition. This valuation of the bridge is based on the Bridge Management System (BMS) which was being studied by the Pusjatan Ministry of Public Work in 2012. The research shows that the main element deteriorated was the approach embankment, retaining wall, rubber bearing and earthquake dump isolator on the north side of Tuban caused by the drainage on the surface, excavation of the front of approach road and the flooding of Bengawan Solo river. The overall condition of the bridge is valuated with 4 (four) mark so that the bridge is needed to have the strengthening and replacement on the deteriorate elements

References

Tuban Public Work Agency, “Penutupan Jembatan Glendeng,†2020. http://bloktuban.com/2020/12/03/jembatan-glendeng-penghubung-tuban-bojonegoro-kembali-ditutup-total/.

M. E. Sunaryo, “Ketidakstabilan Timbunan Oprit Jembatan Akibat Dampak Perubahan Tata Guna Lahan dan Pola Aliran Sungai,†vol. 1, no. 1, pp. 47–58, 2015.

Bakhtiar, “Penurunan Pelindung Abutment Jembatan Akibat Pengaruh Aliran Turbulensi dan Lokal Scouring pada Uji Model Hidraulik,†Bandung, 2013.

Pusjatan, “Pedoman Pemeriksaan Jembatan,†Jakarta, Indonesia, 2012.

W. Harywijaya, M. Afifuddin, and M. Isya, “Penilaian Kondisi Jembatan Menggunakan Bridge Management System (BMS) Dan Bridge Condition Rating (BCR),†J. Arsip Rekayasa Sipil dan Perenc., vol. 3, no. 1, pp. 443–451, 2020, doi: 10.24815/jarsp.v3i1.16462.

F. Hariman, H. Christady H., and A. Triwiyono, “Evaluasi Dan Program Pemeliharaan Jembatan Dengan Metode Bridge Management System (BMS) (Studi Kasus : Empat Jembatan Propinsi D.I. Yogyakarta),†Civ. Eng. Forum Tek. Sipil, vol. 17, no. 3, pp. 581-593–593, 2007.

Y. Herry, S. M. Nuh, and M. Indrayadi, “Penilaian Kondisi Jembatan Rangka Baja Di Kabupaten Sintang Menggunakan Metode Bridge Manajement System (BMS) (Studi Kasus Jembatan Kapuas III, Kabupaten Sintang),†2016.

H. Sudradjat, L. Djakfar, and Y. Zaika, “Penentuan Prioritas Penanganan Jembatan Pada Jaringan Jalan Provinsi Jawa Timur ( Wilayah UPT Surabaya : Kota Surabaya , Kabupaten Sidoarjo dan Kabupaten Gresik ),†vol. 9, no. 3, pp. 219–228, 2015.

M. Marsuki M., A. Triwiyono, and H. Christady, “Penilaian Kondisi Jembatan Dengan Metode NYSDOT (Studi Kasus 3 Jembatan Di Kota Kendari),†Civ. Eng. Forum Tek. Sipil, vol. 19, no. 1, pp. 1000–1008, 2009.

BMS, “Bridge Management System,†Jakarta, 1992.