Skip to main content
Skip to main navigation menu
Skip to site footer
Open Menu
Home
Announcements
Archives
Search
Register
Login
Home
/
Archives
/
Vol. 4 No. 2 (2023)
Vol. 4 No. 2 (2023)
DOI:
https://doi.org/10.33474/jice.v4i2
Published:
2023-12-06
Articles
PERFORMANCE INTERSECTION OF PANGLIMA SUDIRMAN – UNTUNG SUROPATI NORTH STREET OF MALANG CITY
M. Sa'dillah,
Universitas Tribhuwana Tunggadewi, Malang, Indonesia, Indonesia
Andy Kristafi Arifianto ,
Universitas Tribhuwana Tunggadewi, Malang, Indonesia, Indonesia
Ignasia Bule ,
Universitas Tribhuwana Tunggadewi, Malang, Indonesia, Indonesia
109-115
PDF
DOI :
https://doi.org/10.33474/jice.v4i2.20186
145
INFILTRATION WELLS ECO-DRAINAGE PLANNING AS A FLOOD PREVENTION EFFORT IN BINANGUN SUB-DISTRICT, BLITAR REGENCY
Zainal Fanani,
Universitas Nahdlatul Ulama Blitar, Indonesia
Risma Dwi Atmajayani,
Universitas Nahdlatul Ulama Blitar, Indonesia
Nindya Yusniartanti,
Universitas Nahdlatul Ulama Blitar, Indonesia
116-128
PDF
DOI :
https://doi.org/10.33474/jice.v4i2.20328
277
HIGH QUALITY ECONOMICAL CONCRETE WITH VARYING COMPOSITIONS OF RECYCLED AGGREGATE AS A SUBSTITUTION OF COARSE AGGREGATE
Rahma Nindya Ayu Hapsari,
Universitas Negeri Semarang, Indonesia
Bambang Haryadi,
Universitas Negeri Semarang, Indonesia
Agung Sutarto,
Universitas Negeri Semarang, Indonesia
Monica Ayu Istianti,
Universitas Negeri Semarang, Indonesia
Joan Rafif Panduwijaya,
Universitas Negeri Semarang, Indonesia
Aulia Putri Lanjarsari,
Universitas Negeri Semarang, Indonesia
129-139
PDF
DOI :
https://doi.org/10.33474/jice.v4i2.20413
131
SPATIAL ANALYSIS IN CONSERVATION SITU IN BANTEN PROVINCE: CASE STUDY OF SITU KADUPAYUNG, PANDEGLANG REGENCY, BANTEN
Isvan Taufik,
Dinas Pekerjaan Umum dan Penataan Ruang Provinsi Banten, Indonesia
Endang Sudrajat,
Dinas Pekerjaan Umum dan Penataan Ruang Provinsi Banten, Indonesia
Meysa Cahya Gemilang,
Dinas Pekerjaan Umum dan Penataan Ruang Provinsi Banten, Indonesia
140-148
PDF
DOI :
https://doi.org/10.33474/jice.v4i2.20587
235
ANALYSIS OF THE DEGREE OF SATURATION AND LEVEL OF SERVICE ON AHMAD YANI ROAD, EAST SUMBA DISTRICT
Amrita Winaya,
Universitas 17 Agustus 1945 Semarang, Indonesia
Frienly Daungu,
Universitas 17 Agustus 1945 Semarang, Indonesia
149-155
PDF
DOI :
https://doi.org/10.33474/jice.v4i2.20483
92
ANALYSIS OF COMPRESSIVE STRENGTH PAVING BLOCKS WITH THE ADDITION OF COCONUT FIBER AND SUPERPLASTICIZER LIQUID
Fairus Zabadi,
Universitas Madura, Indonesia
Taurina J. Irwanto,
Universitas Madura, Indonesia
156-167
PDF
DOI :
https://doi.org/10.33474/jice.v4i2.20517
102
SIMULATION OF TRAFFIC MANAGEMENT AND ENGINEERING TO IMPROVE THE PERFORMANCE OF THE FIVE POINT INTERSECTION ON JALAN KEPUTIH SURABAYA
Desi Aura Lestari,
Institut Teknologi Adhi Tama Surabaya, Indonesia
Kurnia Hadi Putra,
Institut Teknologi Adhi Tama Surabaya, Indonesia
Theresia Maria Chandra Agusdini,
Institut Teknologi Adhi Tama Surabaya, Indonesia
168-175
PDF
DOI :
https://doi.org/10.33474/jice.v4i2.20592
170
EXPERIMENTS USING ABS PLASTIC SEEDS (ACRYLONITRILE BUTADIENE STYRENE) AS ADDITIONAL MATERIALS IN PORUS ASPHALT MIXTURE
Didakus Thomas Dapa Ole,
Universitas Tribhuwana Tunggadewi, Indonesia
M. Sa'dillah,
Universitas Tribhuwana Tunggadewi Malang, Indonesia
Blima Oktaviastuti,
Universitas Tribhuwana Tunggadewi Malang, Indonesia
176-184
PDF
DOI :
https://doi.org/10.33474/jice.v4i2.20440
145
RECHARGE WELLS MODEL BASED ON SHAPE FACTORS FOR FLOOD MANAGEMENT IN KLOJEN DISTRICT, MALANG CITY
Azizah Rokhmawati,
Universitas Islam Malang, Indonesia
Fachrurozi Ilhamsyah,
Universitas Islam Malang, Indonesia
Bambang Suprapto,
Universitas Islam Malang, Indonesia
185-194
PDF
DOI :
https://doi.org/10.33474/jice.v4i2.20930
101
OCCUPATIONAL HEALTH AND SAFETY (K3) RISK ANALYSIS USING HIRADC AND JSA METHODS IN BRIDGE REPLACEMENT PROJECTS
Risma Khoiri,
Universitas Nahdlatul Ulama Blitar, Indonesia
Risma Dwi Admajayani,
University of Nahdlatul Ulama Blitar, Indonesia
Trisno Widodo,
University of Nahdlatul Ulama Blitar, Indonesia
195-210
PDF
DOI :
https://doi.org/10.33474/jice.v4i2.20250
156
ANALYSIS OF TRAFFIC ACCIDENTS IN THE WEST SURABAYA REGION (CASE STUDY: KALIANAK ROAD TO ROMOKALISARI HIGHWAY)
Eka Safitri,
Institut Teknologi Adhi Tama Surabaya, Indonesia
Kurnia Hadi Putra,
Institut Teknologi Adhi Tama Surabaya, Indonesia
Theresia Maria Chandra Agusdini,
Institut Teknologi Adhi Tama Surabaya, Indonesia
211-223
PDF
DOI :
https://doi.org/10.33474/jice.v4i2.20845
108
ANALYSIS OF DELAY FACTORS IN THE CONSTRUCTION PROJECT OF THE PROMOTION CENTER BUILDING AND BATIK DERIVATIVE PRODUCTION BUILDING IN PAMEKASAN
Ahmad Fatoni,
Universitas Madura, Indonesia
Fairus Zabadi,
Universitas Madura, Indonesia
Muhammad Saifuddin,
Universitas Madura, Indonesia
224-233
PDF
DOI :
https://doi.org/10.33474/jice.v4i2.20554
70
ANALYSIS OF OCCUPATIONAL SAFETY AND HEALTH (K3) RISK IN THE CONSTRUCTION OF SAMPANG SOUTH RING ROAD (JLS) USING HAZID HIRA AND HAZOP METHODS
hazin mukti,
Universitas Madura, Indonesia
Fairus Zabadi,
Universitas Madura, Indonesia
234-243
PDF
DOI :
https://doi.org/10.33474/jice.v4i2.20553
112
QUICK MENU
About JICE
Focus & Scope
Editorial Team
Peer Review Process
Reviewer Guidelines
Reviewers
Publication Ethics
R-W-C-R-R Policies
Open Access Policy
Plagiarism Policy
Copyright and License
Author Guidelines
Author Fee
Online Submissions
Contact Support
Statcounter Visitor
Journal Info Support
Template
Plagiarism Software
Reference Software
Journal